Costing Schedule Construction Project

Job ID: 32207036

Budget: €30 – €250 EUR

Hello, I need an example of breakdown in a costing schedule for a construction project, a high-rise development of apartments. It will have to have the standard breakdown per construction section and values per construction section based on a percentage of the overall construction costs. The project is in Europe mainland. Due to confidentiality restrictions I can not reveal the exact location. I have basic dimensions (overall buildable m2) but no full construction drawings. As an extra note, I can only check the bids tomorrow, but I will get back to suitable bids as soon as I can.